GA-1 · General Aptitude: quantitative
Time and work
1. A alone can do a piece of work in 18 days and B alone in 36 days. They work together for 4 days, after which B leaves. In how many more days will A finish the work?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 21 km north, turns left and walks 1 km, turns left again and walks 6 km, then turns right and walks 7 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Numerical methods
3. Using the trapezoidal rule with 4 equal intervals, estimate ∫ from 0 to 1 of 1/(1 + x) dx.
Subject · Mechanical Engineering
Manufacturing
4. A 40 mm diameter workpiece turns at 200 rpm. What is the cutting speed in m/min?
5. A tool follows Taylor’s law VTⁿ = C with n = 0.5. It lasts 90 min at 100 m/min. How long does it last at 125 m/min?
6. A mass of 5 kg hangs on a spring of stiffness 1000 N/m. What is the natural frequency of its vertical vibration, in Hz? (revision: Theory of machines)