tutor.org.in

GATE Computer Science and Information Technology (CS) · Day 203 of 300

Day 203.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Time and work

  1. 1. Leela can clean a warehouse in 12 days and Gauri can do it in 24 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 14 km north, turns left and walks 3 km, turns left again and walks 2 km, then turns right and walks 2 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. A bag has 9 red and 8 blue balls. Two are drawn without replacement. What is the probability that both are red?

    Options for problem 3

Subject · Computer Science and Information Technology

Algorithms

  1. 4. An undirected weighted graph has edges A–B (3), A–C (6), C–D (1), B–E (9), E–C (8), E–D (1), C–B (6). What is the weight of its minimum spanning tree?

    Options for problem 4
  2. 5. An undirected weighted graph has edges A–B (7), A–C (7), C–D (7), B–E (5), D–B (9), D–A (2), A–E (9). What is the weight of its minimum spanning tree?

    Options for problem 5
  3. 6. A 2-way set-associative cache of 16 KB has 16-byte blocks; addresses are 32 bits. How many bits are in the tag? (revision: Computer organisation)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.