tutor.org.in

GATE Computer Science and Information Technology (CS) · Day 202 of 300

Day 202.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Time and work

  1. 1. Farhan can tile a floor in 6 days and Indu can do it in 12 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 7 km north, turns right and walks 10 km, turns right again and walks 2 km, then turns left and walks 2 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. The lifetime of a component is exponentially distributed with mean 4 years. What is the probability that it lasts more than 5 years?

    Options for problem 3

Subject · Computer Science and Information Technology

Algorithms

  1. 4. An undirected weighted graph has edges A–B (9), A–C (7), B–D (8), B–E (2), D–C (8), A–D (6), C–B (9). What is the weight of its minimum spanning tree?

    Options for problem 4
  2. 5. What does T(n) = 2T(n/2) + n^2 solve to?

    Options for problem 5
  3. 6. A 2 KB frame (1 KB = 1000 bytes) is sent over a 1 Mbps link 2000 km long; signals travel at 2 × 10⁸ m/s. What is the total delay (transmission + propagation) in ms? (revision: Computer networks)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.