GA-1 · General Aptitude: quantitative
Time and work
1. Gauri can build a wall in 21 days and Leela can do it in 42 days. Working together, in how many days will they finish it?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 12 km north, turns right and walks 7 km, turns right again and walks 4 km, then turns left and walks 8 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Probability and statistics
3. A bag has 3 red and 4 blue balls. Two are drawn without replacement. What is the probability that both are red?
Subject · Mechanical Engineering
Manufacturing
4. A tool follows Taylor’s law VTⁿ = C with n = 0.2. It lasts 30 min at 80 m/min. How long does it last at 96 m/min?
5. A 40 mm diameter workpiece turns at 200 rpm. What is the cutting speed in m/min?
6. A rectangular beam section 150 mm wide and 200 mm deep carries a bending moment of 20 kN·m. What is the maximum bending stress, in MPa? (revision: Strength of materials)