  1. 1. Gauri can build a wall in 21 days and Leela can do it in 42 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 12 km north, turns right and walks 7 km, turns right again and walks 4 km, then turns left and walks 8 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. A bag has 3 red and 4 blue balls. Two are drawn without replacement. What is the probability that both are red?

    Options for problem 3

Subject · Mechanical Engineering

Manufacturing

  1. 4. A tool follows Taylor’s law VTⁿ = C with n = 0.2. It lasts 30 min at 80 m/min. How long does it last at 96 m/min?

    Options for problem 4
  2. 5. A 40 mm diameter workpiece turns at 200 rpm. What is the cutting speed in m/min?

    Options for problem 5
  3. 6. A rectangular beam section 150 mm wide and 200 mm deep carries a bending moment of 20 kN·m. What is the maximum bending stress, in MPa? (revision: Strength of materials)