GA-1 · General Aptitude: quantitative
Time and work
1. Esha can paint a house in 24 days and Asha can do it in 40 days. Working together, in how many days will they finish it?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 8 km north, turns right and walks 6 km, turns right again and walks 2 km, then turns left and walks 2 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Probability and statistics
3. A condition affects 5% of a population. A test detects it in 90% of those who have it and gives a false positive in 5% of those who do not. A person tests positive. What is the probability they have the condition?
Subject · Mechanical Engineering
Manufacturing
4. A 50 mm diameter workpiece turns at 500 rpm. What is the cutting speed in m/min?
5. A tool follows Taylor’s law VTⁿ = C with n = 0.25. It lasts 60 min at 60 m/min. How long does it last at 72 m/min?
6. What mass of air (R = 0.287 kJ/kg·K) occupies 2 m³ at 200 kPa and 27 °C? (revision: Thermodynamics)