  1. 1. If a + b = 11 and ab = 2, what is a² + b²?

    Options for problem 1

GA-2 · General Aptitude: analytical

Calendars

  1. 2. Today is Thursday. What day of the week will it be 570 days from today?

    Options for problem 2

EM · Engineering Mathematics

Vector calculus

  1. 3. Evaluate the line integral of (−5y dx + 5x dy) once anticlockwise around the circle x² + y² = 9.

    Options for problem 3

Subject · Electrical Engineering

Power systems

  1. 4. On a long transmission line at light load, the receiving-end voltage can exceed the sending-end voltage. This is:

    Options for problem 4
  2. 5. A balanced three-phase load takes 92 A at a line voltage of 11000 V and power factor 0.8. What real power does it take, in kW?

    Options for problem 5
  3. 6. A standard second-order system has damping ratio 0.2. What is its peak overshoot to a step, in per cent? (revision: Control systems)

    Options for problem 6