Time and work

  1. 1. Omkar can paint a house in 12 days and Chitra can do it in 24 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 8 km north, turns left and walks 8 km, turns left again and walks 3 km, then turns right and walks 4 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Numerical methods

  1. 3. Using the trapezoidal rule with 4 equal intervals, estimate ∫ from 0 to 1 of 1/(1 + x) dx.

    Options for problem 3

Subject · Electrical Engineering

Electrical machines

  1. 4. A 4-pole induction motor on 50 Hz runs at 1477 rpm. What is its slip, in per cent?

    Options for problem 4
  2. 5. A 6-pole induction motor on 50 Hz runs at 973 rpm. What is its slip, in per cent?

    Options for problem 5
  3. 6. An uncharged 20 µF capacitor is charged from 10 V through 1 kΩ. What is the capacitor voltage 40 ms after the switch closes? (revision: Electric circuits)