GA-1 · General Aptitude: quantitative
Time and work
1. A alone can do a piece of work in 18 days and B alone in 36 days. They work together for 6 days, after which B leaves. In how many more days will A finish the work?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 18 km north, turns right and walks 2 km, turns right again and walks 2 km, then turns left and walks 10 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Probability and statistics
3. A bag has 4 red and 7 blue balls. Two are drawn without replacement. What is the probability that both are red?
Subject · Electrical Engineering
Control systems
4. A standard second-order system has damping ratio 0.2. What is its peak overshoot to a step, in per cent?
5. A standard second-order system has damping ratio 0.3. What is its peak overshoot to a step, in per cent?
6. A single-phase load draws 11 A (rms) from 110 V (rms) at a power factor of 0.6 lagging. What real power does it consume? (revision: Electric circuits)