tutor.org.in

GATE Electrical Engineering (EE) · Day 147 of 300

Day 147.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Percentages

  1. 1. Dev’s electricity bill is 50% more than Farhan’s. By what percentage is Farhan’s electricity bill less than Dev’s?

    Options for problem 1

GA-2 · General Aptitude: analytical

Number series

  1. 2. What number comes next in the series? 5, 13, 29, 61, 125, ?

    Options for problem 2

EM · Engineering Mathematics

Linear algebra

  1. 3. What is the rank of the matrix with rows (1, 3, 4), (3, 3, 2) and (−2, 0, 2)?

    Options for problem 3

Subject · Electrical Engineering

Measurements

  1. 4. A meter with full-scale current 5 mA and resistance 20 Ω is to read 1 A full scale. What shunt resistance is needed?

    Options for problem 4
  2. 5. A meter with full-scale current 1 mA and resistance 20 Ω is to read 1 A full scale. What shunt resistance is needed?

    Options for problem 5
  3. 6. A balanced three-phase load takes 10 A at a line voltage of 440 V and power factor 0.85. What real power does it take, in kW? (revision: Power systems)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.