GA-1 · General Aptitude: quantitative
Algebra
1. If a + b = 9 and ab = 18, what is a² + b²?
GA-2 · General Aptitude: analytical
Calendars
2. Today is Monday. What day of the week will it be 109 days from today?
EM · Engineering Mathematics
Vector calculus
3. Evaluate the line integral of (−4y dx + 4x dy) once anticlockwise around the circle x² + y² = 9.
Subject · Electrical Engineering
Power systems
4. On a long transmission line at light load, the receiving-end voltage can exceed the sending-end voltage. This is:
5. A line has an impedance of 20 Ω. On a base of 100 MVA and 33 kV, what is its per-unit impedance?
6. A single-phase load draws 18 A (rms) from 230 V (rms) at a power factor of 0.7 lagging. What real power does it consume? (revision: Electric circuits)