tutor.org.in

GATE Electronics and Communication Engineering (EC) · Day 205 of 300

Day 205.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Time and work

  1. 1. Jai can paint a house in 24 days and Gauri can do it in 40 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 17 km north, turns left and walks 2 km, turns left again and walks 1 km, then turns right and walks 10 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. The lifetime of a component is exponentially distributed with mean 4 years. What is the probability that it lasts more than 5 years?

    Options for problem 3

Subject · Electronics and Communication Engineering

Control systems

  1. 4. A standard second-order system has damping ratio 0.4. What is its peak overshoot to a step, in per cent?

    Options for problem 4
  2. 5. A standard second-order system has damping ratio 0.3. What is its peak overshoot to a step, in per cent?

    Options for problem 5
  3. 6. An amplifier’s output power is 50 times its input power. What is its power gain in decibels? (revision: Communications)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.