GA-1 · General Aptitude: quantitative
Algebra
1. If x + 1/x = 13, what is the value of x² + 1/x²?
GA-2 · General Aptitude: analytical
Calendars
2. Today is Thursday. What day of the week will it be 192 days from today?
EM · Engineering Mathematics
Complex variables
3. If f = u + iv is analytic, which pair of equations must hold?
Subject · Civil Engineering
Surveying
4. What is the correction for the Earth’s curvature (alone) over a sight of 2 km, in metres?
5. A backsight of 0.826 m is taken on a benchmark of reduced level 200 m, and a foresight of 2.565 m on point P. What is the reduced level of P?
6. A waste has ultimate BOD 250 mg/L and a deoxygenation constant of 0.15 per day (base 10). What is its 5-day BOD? (revision: Environmental engineering)