Time and work

  1. 1. Leela can assemble a batch of desks in 12 days and Jai can do it in 24 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 5 km north, turns left and walks 2 km, turns left again and walks 1 km, then turns right and walks 1 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. The lifetime of a component is exponentially distributed with mean 5 years. What is the probability that it lasts more than 5 years?

    Options for problem 3

Subject · Civil Engineering

Environmental engineering

  1. 4. A waste has ultimate BOD 300 mg/L and a deoxygenation constant of 0.15 per day (base 10). What is its 5-day BOD?

    Options for problem 4
  2. 5. A sedimentation tank of volume 750 m³ treats 4 million litres a day. What is its detention time, in hours?

    Options for problem 5
  3. 6. A simply supported steel beam (E = 200 GPa, I = 300 × 10⁶ mm⁴) of span 6 m carries a uniform load of 10 kN/m. What is its midspan deflection in mm? (revision: Structural analysis)

    Options for problem 6