tutor.org.in

GATE Civil Engineering (CE) · Day 28 of 300

Day 28.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Simple and compound interest

  1. 1. What is the difference between the compound interest (compounded yearly) and the simple interest on ₹50,000 for 2 years at 8% per annum?

    Options for problem 1

GA-2 · General Aptitude: analytical

Letter series

  1. 2. Which letter comes next? B, E, H, K, N, ?

    Options for problem 2

EM · Engineering Mathematics

Calculus

  1. 3. What is the maximum value of f(x) = −1x² + 10x + 13?

    Options for problem 3

Subject · Civil Engineering

Geotechnical engineering

  1. 4. A soil has a porosity of 0.3. What is its void ratio?

    Options for problem 4
  2. 5. Water seeps through a soil with coefficient of permeability 1 × 10⁻⁴ m/s, under a head loss of 3 m over a flow length of 25 m, across an area of 2 m². What is the discharge, in m³ per hour?

    Options for problem 5
  3. 6. Water (density 1000 kg/m³, viscosity 0.0015 Pa·s) flows at 1 m/s in a 20 mm pipe. What is the Reynolds number? (revision: Fluid mechanics and hydraulics)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.