tutor.org.in

GATE Civil Engineering (CE) · Day 236 of 300

Day 236.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Algebra

  1. 1. If x + 1/x = 12, what is the value of x² + 1/x²?

    Options for problem 1

GA-2 · General Aptitude: analytical

Calendars

  1. 2. Today is Tuesday. What day of the week will it be 472 days from today?

    Options for problem 2

EM · Engineering Mathematics

Complex variables

  1. 3. What is |z₁z₂| when z₁ = 3 + 4i and z₂ = 8 + 6i?

    Options for problem 3

Subject · Civil Engineering

Surveying

  1. 4. A backsight of 1.405 m is taken on a benchmark of reduced level 250.25 m, and a foresight of 2.392 m on point P. What is the reduced level of P?

    Options for problem 4
  2. 5. A backsight of 1.544 m is taken on a benchmark of reduced level 250.25 m, and a foresight of 2.905 m on point P. What is the reduced level of P?

    Options for problem 5
  3. 6. A sedimentation tank of volume 750 m³ treats 2 million litres a day. What is its detention time, in hours? (revision: Environmental engineering)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.