GATE Civil Engineering (CE) · Day 210 of 300

Day 210.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Time and work

  1. 1. Pia can harvest a field in 10 days and Chitra can do it in 15 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 20 km north, turns left and walks 5 km, turns left again and walks 4 km, then turns right and walks 7 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Numerical methods

  1. 3. Using the Newton–Raphson method for f(x) = x² − 2, starting from x₀ = 1, what is x₁?

    Options for problem 3

Subject · Civil Engineering

Transportation engineering

  1. 4. A horizontal curve of radius 200 m is designed for 60 km/h with a lateral friction coefficient of 0.15. What superelevation is needed (as a fraction)?

    Options for problem 4
  2. 5. What is the stopping sight distance at 50 km/h with a reaction time of 2.5 s and a longitudinal friction coefficient of 0.37?

    Options for problem 5
  3. 6. A waste has ultimate BOD 150 mg/L and a deoxygenation constant of 0.2 per day (base 10). What is its 5-day BOD? (revision: Environmental engineering)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.