GA-1 · General Aptitude: quantitative
Time and work
1. Pia can harvest a field in 10 days and Chitra can do it in 15 days. Working together, in how many days will they finish it?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 20 km north, turns left and walks 5 km, turns left again and walks 4 km, then turns right and walks 7 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Numerical methods
3. Using the Newton–Raphson method for f(x) = x² − 2, starting from x₀ = 1, what is x₁?
Subject · Civil Engineering
Transportation engineering
4. A horizontal curve of radius 200 m is designed for 60 km/h with a lateral friction coefficient of 0.15. What superelevation is needed (as a fraction)?
5. What is the stopping sight distance at 50 km/h with a reaction time of 2.5 s and a longitudinal friction coefficient of 0.37?
6. A waste has ultimate BOD 150 mg/L and a deoxygenation constant of 0.2 per day (base 10). What is its 5-day BOD? (revision: Environmental engineering)