GA-1 · General Aptitude: quantitative
Time and work
1. A alone can do a piece of work in 18 days and B alone in 36 days. They work together for 2 days, after which B leaves. In how many more days will A finish the work?
GA-2 · General Aptitude: analytical
Direction sense
2. Starting from home, Ravi walks 14 km north, turns right and walks 10 km, turns right again and walks 2 km, then turns left and walks 6 km. How far is he from home, and in which direction?
EM · Engineering Mathematics
Probability and statistics
3. A condition affects 5% of a population. A test detects it in 95% of those who have it and gives a false positive in 5% of those who do not. A person tests positive. What is the probability they have the condition?
Subject · Civil Engineering
Environmental engineering
4. A waste has ultimate BOD 200 mg/L and a deoxygenation constant of 0.2 per day (base 10). What is its 5-day BOD?
5. A sedimentation tank of volume 1000 m³ treats 3 million litres a day. What is its detention time, in hours?
6. A channel has hydraulic radius 1.5 m, bed slope 0.0025 and Manning’s n = 0.02. What mean velocity does Manning’s formula give? (revision: Water resources engineering)