tutor.org.in

GATE Civil Engineering (CE) · Day 201 of 300

Day 201.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Time and work

  1. 1. Bilal can paint a house in 14 days and Dev can do it in 35 days. Working together, in how many days will they finish it?

    Options for problem 1

GA-2 · General Aptitude: analytical

Direction sense

  1. 2. Starting from home, Ravi walks 10 km north, turns right and walks 6 km, turns right again and walks 1 km, then turns left and walks 6 km. How far is he from home, and in which direction?

    Options for problem 2

EM · Engineering Mathematics

Probability and statistics

  1. 3. The lifetime of a component is exponentially distributed with mean 10 years. What is the probability that it lasts more than 2 years?

    Options for problem 3

Subject · Civil Engineering

Environmental engineering

  1. 4. A waste has ultimate BOD 200 mg/L and a deoxygenation constant of 0.15 per day (base 10). What is its 5-day BOD?

    Options for problem 4
  2. 5. A waste has ultimate BOD 300 mg/L and a deoxygenation constant of 0.1 per day (base 10). What is its 5-day BOD?

    Options for problem 5
  3. 6. Water seeps through a soil with coefficient of permeability 5 × 10⁻⁴ m/s, under a head loss of 6 m over a flow length of 10 m, across an area of 10 m². What is the discharge, in m³ per hour? (revision: Geotechnical engineering)

    Options for problem 6

Written by TUTOR for its own practice library. A subject’s problems appear once a reviewer has approved its questions.