GA-1 · General Aptitude: quantitative
Progressions
1. An arithmetic progression has first term 1 and common difference 3. What is the sum of its first 27 terms?
GA-2 · General Aptitude: analytical
Ranking and order
2. In a row of students, Kavya is 22nd from the left end and 24th from the right end. How many students are in the row?
EM · Engineering Mathematics
Vector calculus
3. For F = (3x²y) i + (1yz) j + (2z²) k, what is div F at (−2, 0, 0)?
Subject · Civil Engineering
Water resources engineering
4. A channel has hydraulic radius 1.5 m, bed slope 0.0004 and Manning’s n = 0.015. What mean velocity does Manning’s formula give?
5. A catchment of 1 km² with runoff coefficient 0.5 receives a design rainfall intensity of 60 mm/h. What peak runoff does the rational method give?
6. A soil has a porosity of 0.4. What is its void ratio? (revision: Geotechnical engineering)