GATE Civil Engineering (CE) · Day 102 of 300

Day 102.

Choose an answer, check it, and read why each option is right or wrong.

GA-1 · General Aptitude: quantitative

Progressions

  1. 1. An arithmetic progression has first term 1 and common difference −2. What is the sum of its first 18 terms?

    Options for problem 1

GA-2 · General Aptitude: analytical

Calendars

  1. 2. Today is Tuesday. What day of the week will it be 816 days from today?

    Options for problem 2

EM · Engineering Mathematics

Vector calculus

  1. 3. Evaluate the line integral of (−3y dx + 3x dy) once anticlockwise around the circle x² + y² = 4.

    Options for problem 3

Subject · Civil Engineering

Water resources engineering

  1. 4. A catchment of 10 km² with runoff coefficient 0.7 receives a design rainfall intensity of 50 mm/h. What peak runoff does the rational method give?

    Options for problem 4
  2. 5. A catchment of 1 km² with runoff coefficient 0.3 receives a design rainfall intensity of 20 mm/h. What peak runoff does the rational method give?

    Options for problem 5
  3. 6. Water flows at 1 m/s in a 150 mm pipe that narrows to 75 mm. What is the velocity in the narrow section? (revision: Fluid mechanics and hydraulics)

    Options for problem 6